• 2011 Bakun Hydroelectric Project, CW2 Package located at Sarawak Malaysia Project Own by Sarawak Hidro Sdn Bhd
  • 2010 1st Avenue Mall Penang Project own by 1st Avenue Mall Sdn Bhd
  • 2009 St Jude Medical-HVAC & Process Utilities Project own by St Jude Medical Inc
  • 2004 Penang Christian Center
  • 2003 Penang Buddhist Association

Current Project

Project 1

Project Description
QT HIGHTECH MALAYSIA SDN BHD
Project Owner
QT Hightech Malaysia Sdn Bhd
Completion Date
March 2012

Project 2

Project Description
Infineon Kulim
Project Owner
INFINEON TECHNOLOGIES (KULIM SDN BHD)
Completion Date
March 2012

Project 3

Project Description
Carsem (M Site) Sdn Bhd
Project Owner
CARSEM (M SITE) SDN BHD
Completion Date
March 2012

Project 4

Project Description
Gleneagles Medical Center Penang 1 Block 19 Storey Clinic & Wards With Carpark
Project Owner
GLENEAGLES MEDICAL GROUP
Completion Date
March 2012

Completed Project

Project 1

Project Description
Hamadatec at Kulim
Project Owner
Hamadatec Sdn Bhd
Completion Date
Dec 11

Project 2

Project Description
Ideal Property -Build In Wiring & Air Cond Pipe System
Project Owner
Ideal Property Development Sdn Bhd
Completion Date
December 2011

Project 3

Project Description
BAKUN HYDROLIC POWER PLANT SARAWAK
Project Owner
SARAWAK HYDRO SDN BHD
Completion Date
March 2011

Project 4

Project Description
Mr Ong Peng Chor 3 Storey bungalow House – To supply and installl VRF system installation work at Tanjung Pinang
Project Owner
Mr Ong Peng Chor
Completion Date
November 2010

Project 5

Project Description
1st Avenue shopping mall Cinemas -ACMV services
Project Owner
Capital Land -1st Avenue
Completion Date
October 2010

Project 6

Project Description
PARAMOUNT INTERNATIONAL SCHOOL -PENANG
Project Owner
PARAMOUNT
Completion Date
Dec 11

Project 7

Project Description
VESTECH PMU AIR COND SYSTEM AT SG PINANG PENANG
Project Owner
TNB NASIONAL BERHAD
Completion Date
Feb 11

Project 8

Project Description
MEMC Wire Saw
Project Owner
MEMC IPOH SDN BHD
Completion Date
Nov 11

Project 9

Project Description
Fondcare Sdn Bhd
Project Owner
Fondcare Sdn Bhd
Completion Date
Nov 11

Project 10

Project Description
SENG HUAT HANG FOR AMPHENOL TCS SDN BHD
Project Owner
SENG HUAT HANG
Completion Date
Jul 11

Project 11

Project Description
MEMC IPOH (M) SDN BHD
Project Owner
MEMC IPOH (M) SDN BHD
Completion Date
Jul 11

Project 12

Project Description
1ST AVENUE LINK BRIDGE AIR COND & VENTILATION
Project Owner
Capital Land -1st Avenue
Completion Date
Jan 11

Project 13

Project Description
MEMC -SARAWAK SOLAR WAFER PLANT PROJECT
Project Owner
MEMC
Completion Date
Jan 11

Project 14

Project Description
MOTOROLA PENANG TO INSTALL ACMV
Project Owner
MOTOROLA
Completion Date
Feb 11

Project 15

Project Description
BENCHMARK ELECTRONICS (M) SDN BHD
Project Owner
PENISULAR HO HUP ENGINEERING SDN BHD
Completion Date
Apr 11

Project 16

Project Description
TTE IBIDIN ASCU WORK AT SWITCH ROOM & ANALYST LAB
Project Owner
IBIDIN
Completion Date
Feb 11

Project 17

Project Description
SOON HUP COOLING TOWER – TO REPLACE INFILL AND COIL AT WISMA SOON HUP SARAWAK
Project Owner
SOON HUP GROUP
Completion Date
Mar 11

Project 18

Project Description
CHEEKY DUCT RESTAURANT AT STRAITS QUEY PENANG
Project Owner
CHEEKY DUCT
Completion Date
30 Oct 10

Project 19

Project Description
MEMC EPI PROJECT PHASE 1 & 2
Project Owner
MEMC IPOH SDN BHD
Completion Date
01 Nov 10

Project 20

Project Description
MEMC SUBSTATION – TO SUPPLY & INSTALL 11KV SUB STATION SWITCHROOM
Project Owner
MEMC IPOH SDN BHD
Completion Date
27 Dec 10

Project 21

Project Description
FIRST SOLAR MODULE 5 & 6 – BMS WIRING WORK FOR FMCS
Project Owner
FIRST SOLAR
Completion Date
30 Dec 10

Project 22

Project Description
FLEXTRONICS PI CANTEEN AIR CONDITIONINIG UPGRADE WORK
Project Owner
FLEXTRONICS
Completion Date
30 Nov 10

Project 23

Project Description
IAQ MEMC DUCTWORK & AIR CONDITIONING & MECHANICAL INSTALLATION SYSTEM WORK
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Nov 10

Project 24

Project Description
MEMC TO INSTALL MECHANICAL WORKS FOR EDGE PROFILER
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Oct 10

Project 25

Project Description
MEMC- TO INSTALL HOOK UP FOR 3RD EDGE GRINDER
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Oct 10

Project 26

Project Description
MEMC- TO INSTALL NTC TOOL INSTALL HOOK UP
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Oct 10

Project 27

Project Description
MEMC- TO INSTALL LOW TEMPERATURE PROCESS COOLING
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Oct 10

Project 28

Project Description
MEMC PRODUCTION – TO INSTALL OF PVE SCH 80 & GI EXHAUST DUCT FOR CHEMICAL CABINET AT PRODUCTION AREA
Project Owner
MEMC IPOH SDN BHD
Completion Date
30 Oct 10

Project 29

Project Description
St Jude connection – Process Utilities
Project Owner
St Jude Medical Inc
Completion Date
01 Aug 10

Project 30

Project Description
Carsem AHU M Site -HVAC System
Project Owner
CARSEM (M) & (S) Jalan Lapangan Terbang Po Box 204 30720 Ipoh Perak
Completion Date
01 Sep 10

Project 31

Project Description
NGC Garter – HVAC & Process Utiulities
Project Owner
NGC Garter
Completion Date
01 Jun 10

Project 32

Project Description
MEMC GI Gutter
Project Owner
MEMC IPOH SDN BHD
Completion Date
01 Jun 10

Project 33

Project Description
ST Jude Medical -Process Utilities
Project Owner
St Jude Medical Inc
Completion Date
12 Feb 2010

Project 34

Project Description
ST Jude Medical -HVAC
Project Owner
St Jude Medical Inc
Completion Date
12 Feb 2010

Project 35

Project Description
TTEIbidin VRV at Penang Sains Park – VRV system
Project Owner
IBIDIN
Completion Date
Dec 2009

Project 36

Project Description
MEMC IPOH SDN BHD -HVAC & Air cond system
Project Owner
MEMC IPOH SDN BHD
Completion Date
July 2009

Project 37

Project Description
OCBC -PENANG & BUTTERWORTH -Air Cond system
Project Owner
JURUSTRAJAYA SDN BHD Lot 39B, Batu 5, Jalan Ampang 68000 Ampang Selangor
Completion Date
March 2008

Project 38

Project Description
PENTAMASTER TECHNOLOGY SDN BHD -HVAC system
Project Owner
PENTAMASTER
Completion Date
"Dec 2008

Project 39

Project Description
NADI PERKESO -ALOR SETAR -HVAC System
Project Owner
PERKESO
Completion Date
Dec 2008

Project 40

Project Description
MOTOROLA PENANG -HVAC System
Project Owner
MOTOROLA
Completion Date
Dec 2008

Project 41

Project Description
FIRST SOLAR BMS SYSTEM – MODULE 2
Project Owner
FIRST SOLAR
Completion Date
June 2008

Project 42

Project Description
PETRONAS SEGAMAT (COMP STATION EXTENSION)-HVAC & Ventilation System
Project Owner
PETRONAS
Completion Date
Dec 2008

Project 43

Project Description
SUBANG AVENUE -SHOPPING CENTER -SELANGOR-HVAC & Mechanical System
Project Owner
BRUNDSFIELD
Completion Date
June 2009

Project 44

Project Description
NS COOLING TOWER OFFICE PRAI- HVAC system
Project Owner
NS
Completion Date
Nov 2008

Project 45

Project Description
FIRST SOLAR BMS SYSTEM – MODULE 3&4
Project Owner
FIRST SOLAR
Completion Date
Dec 2008

Project 46

Project Description
MUTIARA PARADE PENANG-HVAC & Mechnical System
Project Owner
LION MUTIARA
Completion Date
March 2010

Project 47

Project Description
DELL PACIFIC – CHILLER REPLACEMENT
Project Owner
DELL
Completion Date
Jan 2009

Project 48

Project Description
PERTUBUHAN KESELAMATAN SOSIAL (PERKESO) KEDAH-HVAC & Mechanical system
Project Owner
PERKESO
Completion Date
12 Nov 2008

Project 49

Project Description
CYGAL PROPERTIES-HVAC System
Project Owner
CYGAL PROPERTIES
Completion Date
Dec 2009

Project 50

Project Description
PETRONAS KUANTAN (COMP STATION EXTENSION)-HVAC System
Project Owner
PETRONAS
Completion Date
Jan 2008

Project 51

Project Description
PRESIDE ENGINEERING SDN BHD -UNTUK MEMBINA 1 BLOCK KILANG DENGAN 2 TINGKAT PEJABAT DI ATAS PLOT 216 9(B) TAMAN PERINDUSTRIAN BUKIT MINYAK 13 SEBERANG PERAAI TENGAH FOR AIR COND SYSTEM -HVAC System
Project Owner
PRESIDE ENGINEERING SDN BHD 45&42a, Kuantan Road 10150 Penang
Completion Date
Dec 2007

Project 52

Project Description
CARSEM (S) & (M)SDN BHD – PTTC OFFICE-HVAC System
Project Owner
CARSEM (M) & (S) Jalan Lapangan Terbang Po Box 204 30720 Ipoh Perak
Completion Date
March 2008

Project 53

Project Description
JABIL CIRCUIT NEW AUDITORIUM-HVAC System
Project Owner
JABIL CIRCUIT
Completion Date
31 August 2007

Project 54

Project Description
BAYAN JAYA PENANG -HVAC & Mechanical
Project Owner
BAYAN JAYA
Completion Date
Dec 2009

Project 55

Project Description
ORYX ADVANCED SDN BHD PENANG-HVAC & Ventilation System
Project Owner
ORYX ADVANCED
Completion Date
July 2008

Project 56

Project Description
FIRST SOLAR BMS SYSTEM – MODULE 1
Project Owner
FIRST SOLAR
Completion Date
March 2008

Project 57

Project Description
MULTI NATIONAL COMPANY -PG7 TECHNICAL LAB -HVAC & Hook Up
Project Owner
MNC (PG7) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Completion Date
11 Nov 2006

Project 58

Project Description
MULTINATIONAL COMPANY KM1 TIGC Q306 & Q207 -Hook Up
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
12 June 2007

Project 59

Project Description
MULTI NATIONAL COMPANY -Q4 05 PROGRESSIVE BUILD AT KM2 – Hook Up
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
31 Oct 2006

Project 60

Project Description
MULTI NATIONAL COMPANY Q305 PROGRESSIVE BUILD AT PG8 & KM1 – Hook Up
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
30 Sept 2006

Project 61

Project Description
PENTAMASTER TECHNOLOGY (M) SDN BHD- Hvac & Mechanical
Project Owner
PENTAMASTER TECHNOLOGY (M) SDN BHD Plot 17(B) Medan bayan lepas Technoplex Taman perindustrian Bayan Lepas Penang
Completion Date
30 May 2005

Project 62

Project Description
MULTI NATIONAL COMPANY – PG7 7 FOL -Hook Up
Project Owner
MNC (PG7) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Completion Date
23 Dec 2005

Project 63

Project Description
MULTI NATIONAL COMPANY – PG8 BCR -Hook Up
Project Owner
MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Completion Date
26 August 2005

Project 64

Project Description
MALAYSIAN BUDDHIST ASSOCIATION – HVAC & Mechanical
Project Owner
MALAYSIA BUDDHIST ASSOCIATION JLN BURMAH PENANG
Completion Date
23 May 2005

Project 65

Project Description
MULTI NATIONAL COMPANY – KM3 -HVAC & Mechanical
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
31 Mar 06

Project 66

Project Description
MULTI NATIONAL COMPANY – KM1 CMT 29-42 -Hvac & Mechanical
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
20 June 2005

Project 67

Project Description
HFB LASER TECH (M) SDN BHD- Hvac & Mechanical
Project Owner
HFB LASER TECH (M) SDN BHD
Completion Date
30 April 2005

Project 68

Project Description
Apex Properties -Air cond & Ventilation Systems-
Project Owner
Apec Properties Sdn Bhd Plot 74 , Kawasan Perusahaan Bukit Tengah Mukim 11 Seberang Jaya Perai Tengah
Completion Date
28 Feb 2004

Project 69

Project Description
GUYNEY PLAZA Office Renovation work For Hvac & Mechanical
Project Owner
Gurnay Plaza Sdn Bhd 170-06-01 Plaza Gurney persiaran Gurney 10250 Penang
Completion Date
15 Nov 2004

Project 70

Project Description
Widetech HVAC & Widetech Process System – HVAC & Process system
Project Owner
Widetech Manufacturing Sdn Bhd Factory At Bayan Lepas Industrial Estate Mk 12.D.B.D Phase 4 Penang
Completion Date
31 Mar 2004

Project 71

Project Description
Pentamaster Factory Extention HVAC system
Project Owner
PENTAMASTER TECHNOLOGY (M) SDN BHD Plot 17(B) Medan bayan lepas Technoplex Taman perindustrian Bayan Lepas Penang
Completion Date
29 Feb 2004

Project 72

Project Description
Parti Gerkana Rakyat Malaysia -Air conditioning & mechanical Ventilation System
Project Owner
Parti Gerakan Rakyat Malaysia No1 , 139 jalan Macalister Di Atas Lot 9 1312 Dan 1340 Sek 12, Bandar Georgetown
Completion Date
Dec 03

Project 73

Project Description
Multinational Companyy -Pg12 NPG Lab +_ ATD Lab -Hook Up
Project Owner
Hiti Engineering (M) Sdn Bhd Wisma Hiti Lot P.T 14274 Jalan SU 8 , Seksyen 26Persiaran Tengku Ampuan 40400 Shah Alam
Completion Date
Sept 03

Project 74

Project Description
Multi National Company – Km1 Q4-02 Progressive Build -Hook Up
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
July 03

Project 75

Project Description
Multi National Company -Pg8 Combined Project -Hook Up
Project Owner
MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Completion Date
Sept 03

Project 76

Project Description
Compressor Assembly for Trane chiller No 2
Project Owner
Mega Express Air Conditioning Sdn Bhd 737-3-8 Sri Sungai Nibong Complex Jalan Sultan Azlan Shah b ayan Lepas Penang
Completion Date
July 03

Project 77

Project Description
MNC-KM1/Pg7 & PG8 Mechanical Exhaust System Upgrading
Project Owner
MNC (PG8) BAYAN LEPAS FREE INDUSTRIAL ZONE BAYAN LEPAS PENANG
Completion Date
July 2003

Project 78

Project Description
PCC -Installation Air cond & Exhaust System of Penang Christian Center At jalan Khaw Sim Bee
Project Owner
PENANG CHRISTIAN CENTER
Completion Date
Jan 2004

Project 79

Project Description
B & W Food Products Sdn Bhd -Hvac & Mechanical
Project Owner
B&W Food Products Sdn Bhd 4765 Lorong Permatang Pauh 13400 Butterworth
Completion Date
Sept 2002

Project 80

Project Description
MNC , Supply , Installation ,Delivery to Site T&C HVAC ducting , Piping & Utilities Work
Project Owner
Hiti Engineering (M) Sdn Bhd Wisma Hiti Lot P.T 14274 Jalan SU 8 , Seksyen 26Persiaran Tengku Ampuan 40400 Shah Alam
Completion Date
April 2002

Project 81

Project Description
MNC Company Km1 FCPGA Phase 2 General Contractor Package
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
Jan 2002

Project 82

Project Description
IClarm The World Fish Center -Headquarter Renovation Project
Project Owner
International Center For Living Aquatics Resources Management -Jalan Batu Maung 11960 Bayan Lepas Penang
Completion Date
July 2001

Project 83

Project Description
ASIA Composite MFG -Hvac & Mechanical Package
Project Owner
ASIA COMPOSITE MFG
Completion Date
Feb 2001

Project 84

Project Description
SITT TATT Industrial Gases – Wafer Tech At Kulim Hi Tech
Project Owner
WAFER TECH
Completion Date
Dec 2000

Project 85

Project Description
Wafer Technology – Kulim Hi tech Park – Hvac & Mechanical Package
Project Owner
WAFER TECH
Completion Date
Julai 2000

Project 86

Project Description
MNC – FCPGA PPV/Tester Expansion
Project Owner
MNC Plot 8-12 & 39 Phase1 Kulim Hi Tech Park 09000 Kulim
Completion Date
October 2000

Project 87

Project Description
Applied Materials – Fit Out Work @ KHTP
Project Owner
Bovis (M) Sdn Bhd Level 11, tower 1 MNI Twins 11 Jalan Pinang 50450 Kuala Lumpur
Completion Date
Julai 2000

Project 88

Project Description
Federal Express -Air Cond & Ventilation System
Project Owner
Iviron (M) Sdn Bhd 68-B Jalan Masjid Negeri 11600 Pulau Pinang
Completion Date
April 2000

Project 89

Project Description
IP Softcom (M) Sddn Bhd -Air Cond & Ventilation system
Project Owner
MEI Project Engineering Sdn Bhd 51-12-A Menara BHL 51 Jalan Sultan Ahmad Shah 10050 Penang
Completion Date
March 2000

Project 90

Project Description
Muti National Company -KM1 Phase 3 -FCPGA -Hook UP
Project Owner
MULTI NATIONAL COMPANY NO PLOT 8-12&38, KULIM HI TECH PARK PHASE3 09000 KULIM KEDAH
Completion Date
march 2000

Project 91

Project Description
Multi National Company KM1 -Retrofit -HVAC & Mechanical Package .
Project Owner
MEI Project Engineering Sdn Bhd 51-12-A Menara BHL 51 Jalan Sultan Ahmad Shah 10050 Penang
Completion Date
Mei 1999